⚡ Limited slots —Reserve your free site survey →
    UM Storage Systems
    Double Your Floor Space Without Building

    MEZZANINE FLOORS UK

    Storage, production and office mezzanine floors designed, manufactured and installed across the UK. Building Regulations and CDM-compliant turnkey projects from one accountable contractor.

    2x

    Floor Area

    5kN/m²

    Storage Loading

    100%

    Building Regs

    60+

    Years Experience

    A mezzanine floor is the fastest, cheapest way to double the usable floor area of a UK warehouse or industrial unit without the cost, planning and lead time of a building extension. UM Storage Systems designs, manufactures and installs mezzanine floors for storage, production, packing, retail back-of-house and office use across the UK.

    Every mezzanine project is delivered as a single turnkey contract: structural design, Building Regulations submission, fire protection, lighting, balustrade, staircases, goods lifts and racking integration are all delivered and signed off by one accountable contractor.

    Storage, Production and Office Mezzanines

    Storage mezzanines are typically loaded to 4.8 or 7.5 kN/m² and are widely used for archive storage, parts holding, e-commerce pick faces and back-of-store stock. Production mezzanines carry heavier point loads and vibration and are engineered with stiffer column grids and reinforced decking. Office mezzanines are loaded to 2.5 kN/m² and finished to commercial office standard.

    Whatever the use, the structural principle is the same: a steel column and beam grid supported on engineered base plates, with composite or chipboard decking and a perimeter handrail or partition. Our designs accommodate sprinkler systems, fire alarms, mechanical services and racking integration from day one.

    Building Regulations and Fire Protection

    Almost all UK mezzanine floors require Building Regulations approval and, in many cases, planning consent for change of use. UM Storage Systems handles the entire process — structural calculations, Approved Document B fire compliance, escape route design, building control liaison and final certificate.

    Fire protection is delivered through intumescent paint or boarded encasement to columns and beams, fire-rated decking where required, and engineered escape routes with fire-rated staircases. We work to current edition Approved Documents A, B, K, M and Q as standard.

    Goods Lifts, Pallet Gates and Conveyors

    Mezzanine access is delivered by a combination of staircases (escape and routine), goods lifts (pallet, mezz or scissor) and pallet gates. We supply and install all three as part of the turnkey package, integrated with the mezzanine structure and the warehouse fire strategy.

    Conveyor and chute systems can be designed into the deck for high-throughput e-commerce operations, allowing pick-and-pack flows to operate seamlessly across multiple levels.

    CDM, Installation and Handover

    All mezzanine projects are delivered under CDM 2015 with UM Storage Systems acting as Principal Contractor. Method statements, risk assessments, pre-construction information and an O&M manual are issued as standard.

    Installation is carried out by directly employed CSCS-certified crews. Handover includes structural calculations, Building Regulations completion certificate, electrical certificates and warranty documentation.

    Key Features

    Loadings to 7.5 kN/m² and beyond
    Composite or chipboard decking
    Building Regulations turnkey
    Fire-rated escape routes
    Goods lifts, pallet gates and conveyors
    CDM 2015 Principal Contractor

    Typical UK Applications

    Storage mezzanines
    Production mezzanines
    Office mezzanines
    Retail back-of-house
    E-commerce pick floors
    Pharmaceutical clean areas
    Vehicle workshop platforms
    Archive and document storage

    FREQUENTLY ASKED QUESTIONS

    Do I need planning permission for a mezzanine?

    Building Regulations approval is required in almost all cases. Planning permission is sometimes required for change of use or where the mezzanine exceeds 50% of the existing ground floor area. We handle both submissions on your behalf.

    How long does a mezzanine installation take?

    Typical 200-500m² storage mezzanines install in 1-3 weeks once the steel is on site. Office and production mezzanines take longer because of fit-out and services.

    Can I add a goods lift to my mezzanine?

    Yes. We supply and install pallet lifts, mezz lifts and scissor lifts as part of the turnkey package, including the lift pit, electrical supply and Building Regs sign-off.

    Is fire protection included in the price?

    Always. Every UM Storage Systems mezzanine quote includes Approved Document B compliance — intumescent paint, fire escape routes, fire-rated doors and any required sprinkler interface.

    READY TO OPTIMISE YOUR WAREHOUSE?

    Get in touch today for a free, no-obligation consultation. Our team will assess your requirements and provide a tailored solution.

    Get a Free Quote

    Detailed quotes for supply, installation, or inspection services

    Request Quote

    Book an Inspection

    Professional racking inspections for safety compliance

    Book Now

    Value My Racking

    Get a valuation for your used pallet racking equipment

    Used Pallet Racking Valuation