RACKING DISMANTLING
Safe, professional racking dismantling and removal across the UK. We decommission all types of warehouse racking, mezzanines and shelving — and we'll buy your surplus stock. Fully insured, SEIRS-qualified teams.
Professional Racking Dismantling Services
Whether you're relocating to a new warehouse, reconfiguring your existing layout, or closing a site, UM Storage Systems provides complete racking dismantling services across the UK. Our SEIRS-qualified teams follow strict safety protocols to dismantle, label, and remove all types of warehouse racking and storage equipment — quickly, safely, and with minimal disruption to your operations.
We also offer a racking buyback service. If your redundant racking is in serviceable condition, we'll make you a competitive offer — potentially offsetting the entire cost of dismantling and removal.
What We Dismantle
Our Dismantling Process
Site survey and project scoping
Risk assessment and method statement (RAMS)
Systematic load-down and bay isolation
Careful dismantling with component labelling
Palletising and transport of components
Site clearance and waste disposal
FREQUENTLY ASKED QUESTIONS
How much does racking dismantling cost?
Costs depend on the quantity, type and height of racking, plus site access conditions. We provide free, no-obligation quotes after a site survey or based on your racking schedule. As a guide, dismantling is typically charged per bay and includes labour, equipment and waste removal.
Can you buy our old racking when you dismantle it?
Yes. If your racking is in reasonable condition, we'll make you a fair offer as part of the dismantling project. This can offset or even cover the cost of dismantling. We handle everything — removal, transport and resale.
How long does dismantling take?
A small warehouse might take 1–2 days. Larger projects with multiple racking runs can take 1–2 weeks. We'll provide a detailed project timeline before work starts and can schedule out-of-hours work to minimise disruption.
Do you dismantle all types of racking?
Yes. We dismantle all racking systems including adjustable pallet racking, drive-in, cantilever, narrow aisle, push-back, mobile shelving, and mezzanine floors. Our teams are experienced with all major manufacturers.
What happens to dismantled racking?
Depending on condition, dismantled racking is either reconditioned and resold (reducing waste), recycled as scrap steel, or disposed of responsibly. We provide a full waste transfer note for compliance.
Racking dismantling is a controlled deconstruction, not a strip-out. Beams are unloaded and removed level by level from the top down, bracing stays in place until the run above is clear, and frames come out last. Done properly, 80–95% of a mainstream-brand system comes off site as re-sellable stock, which is what turns a dilapidations cost into a cheque.
Method: How a Safe Dismantle Actually Runs
We start with a site survey and a written RAMS pack specific to the building: run layout, brand and profile, beam levels, floor fixings, exclusion zones, MEWP access, banksman positions and the traffic route for loading. If the racking is damaged — and on a dilapidated site it usually is — the survey grades it first, because a red-risk upright changes the sequence and sometimes requires temporary propping before anyone touches a beam.
On site, teams work top down within a barriered exclusion zone. Beams are released with connector safety pins removed by hand, lowered rather than dropped, and stacked and banded by size on the floor. Frames are only unbolted from the slab once all beams and any run-spacers are clear. Components are sorted by brand and profile as they come down — mixing Dexion with Link 51 on a pallet destroys most of the resale value.
All our installation and dismantling operatives are SEIRS-carded, IPAF-trained for MEWP work and CSCS-carded, and we carry £10m public liability. We work nights, weekends and phased sequences so trading sites can keep despatching around us.
- Written RAMS and site-specific method statement before mobilisation
- SEIRS-carded racking installers, IPAF and CSCS accredited
- £10m public liability, DBS-checked operatives
- Top-down removal with barriered exclusion zones and banksman
- Components sorted and banded by brand and profile for resale
- Floor bolts cut flush and holes made safe on completion
Dilapidations, Buy-Back and What Your Racking Is Worth
Most calls we take about dismantling are really about a lease end. The landlord wants the building back clear, the schedule of dilapidations has a date on it, and the racking is in the way. In that situation the racking is an asset, not a liability — provided it is a brand with a live second-hand market and the components come down undamaged.
Value depends on brand, profile, quantity, condition and how quickly it can be lifted. A large single-brand run of clean uprights and straight beams may cover the full cost of dismantling and removal, sometimes with money back. A small quantity of an obsolete profile with bent beams will not, and we will say so at survey rather than after the job.
We provide a valuation, a dismantle price and a net figure in one document, plus waste transfer notes for anything scrapped and photographs of the cleared floor for your dilapidations file.
Relocation and Re-Installation
Where you are moving rather than closing, we dismantle, transport, store if the new building is not ready, and re-install to a fresh CAD layout at the new site. Relocation is where the sorting discipline pays: components labelled by run and level go back up in a fraction of the time, and nothing arrives short.
Re-installation is treated as a new installation. The layout is re-drawn for the new building's clear height, sprinkler layout and column grid — very few warehouses are the same shape twice — and the system is handed over with fresh load notices, a handover certificate and a marked-up drawing. We also recommend a SEMA-approved inspection after any relocation, because components that were sound in the old building can be damaged in transit.
Technical Specifications
- Recovery rate
- 80–95% of components re-usableOn mainstream brands dismantled correctly.
- Accreditations
- SEIRS, IPAF, CSCS, DBS£10m public liability insurance.
- Documentation
- RAMS, waste transfer notes, photosSupplied for dilapidations and landlord files.
- Working hours
- Days, nights, weekends, phasedSo live sites keep trading during removal.
- Buy-back
- Valuation offset against dismantle costNet figure quoted in one document.
- Coverage
- UK-wide from the West MidlandsStorage available between dismantle and re-install.
EXPLORE UM STORAGE SYSTEMS
Browse our full range of warehouse storage solutions, products, and expert resources.
Our Services
Products & Equipment
Racking Types
Guides & Resources
Storage Solutions
READY TO OPTIMISE YOUR WAREHOUSE?
Get in touch today for a free, no-obligation consultation. Our team will assess your requirements and provide a tailored solution.
