NEW HEAVY DUTY PALLET RACKING
New heavy duty pallet racking is engineered for manufacturing, engineering, automotive, and high-density 3PL operations where standard APR doesn't have the capacity envelope you need. We design and install new heavy-duty systems across the UK with engineered load notices and full SEIRS sign-off.
From £320 per bay (heavy-duty, supplied & installed) · SEMA-compliant · UK-wide supply & install
Reinforced upright profiles, deeper base plates, and uprated beam sections push capacity well beyond standard APR — typically to 3,000–4,500kg UDL per beam pair, with frames supporting loads of 25,000kg+. Every build is calculated to your exact pallet weight, height of lift, and MHE profile.
We work to the latest EN 15512 / EN 15620 standards using tier-one manufacturers (Mecalux M7, Link 51 XL, SSI Schaefer PR600), and supply a complete turnkey package — site survey, CAD layout, structural calculations, supply, install, and post-install inspection.
Key Features of Heavy Duty Pallet Racking
Beam UDLs to 4,500kg per pair
Frame capacities to 25,000kg+
Deep-section uprights with reinforced base plates
Seismic-rated options for export / regulated markets
Heavy-duty column protectors and end-of-row barriers fitted as standard
Engineered cold-store and outdoor finishes
Specifications
Why Buy New Heavy Duty Pallet Racking?
Engineered to your exact load profile
Stamped manufacturer calculations
10-year warranty on uprights and beams
Future-proofed for capacity growth
Typical Applications
Heavy Duty Pallet Racking is specified across a wide range of UK warehouse and industrial operations:
Engineering & Install
SEMA-designed · SEIRS-installed · HSE-compliant
Every new pallet racking system we supply is installed by SEIRS-registered fitters in full accordance with SEMA codes of practice and HSE guidance. We provide CAD-drawn layouts, structural calculations, signed-off load notices, and a post-installation safety inspection — so the system is compliant from day one.
UK-Wide Delivery & Lead Times
UK-wide delivery direct from manufacturer to your warehouse — typical lead times of 2–4 weeks for standard configurations and 4–6 weeks for bespoke heavy-duty builds. Urgent projects can be expedited using our hybrid new + ex-stock model to compress the schedule.
Related Racking Products
NEW HEAVY DUTY PALLET RACKING — FAQs
Get a Free Quote on Heavy Duty Pallet Racking
Free site survey, CAD layout, fixed-price quotation and nationwide UK install by SEIRS-qualified fitters.
office@umstoragesystems.co.uk
EXPLORE UM STORAGE SYSTEMS
Browse our full range of warehouse storage solutions, products, and expert resources.
